• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Athens Group Logo

Athens Group Services

Rig Inspection

  • Home
  • Services
    • Reactivation, Commissioning, and Upgrade
    • Marine Services
    • Rig Inspection & Acceptance
    • Well Control Equipment
    • Cybersecurity
      • TMECA®
    • Risk Management
  • About Us
    • About Us
    • Our Mission & Core Business Principles
    • Athens Group Services Advantage
    • Surveyor Competency Assurance
    • Integrated Knowledge Management
    • Covid-19 Policy
    • Workplace
    • CyberSecurity Policy
  • News & Resources
    • Projects
    • Newsletters
    • Oil Field Digitalization
  • Contact

Newsletters

FPSO Life Extension: A Systems Approach

December 14, 2015

Technology enhancements that are extending the life of existing production fields, coupled with successful drilling …

Read moreFPSO Life Extension: A Systems Approach

Improve, Don’t Skip Inspections

November 11, 2015

Independent third party asset-condition inspections are a generally accepted method to meet internal quality and …

Read moreImprove, Don’t Skip Inspections

Beyond Non Productive Time (NPT) : Effective Production Time

October 1, 2015

With the increasing downward pressure on oil prices, drilling contractors and operators are becoming more focused on …

Read moreBeyond Non Productive Time (NPT) : Effective Production Time

New BSEE Requirements Allow Operators to be More Proactive

June 26, 2015

Athens Group Services surveyors explain the importance of a new general performance-based requirement that operators use …

Read moreNew BSEE Requirements Allow Operators to be More Proactive

One Safety Integrity Level (SIL) Does Not Fit All: SIL Misuse and Unsafe Operational Conditions

June 2, 2015

The Safety Integrity Level (SIL) is a hazard analysis and risk mitigation method that is used to ensure electronic …

Read moreOne Safety Integrity Level (SIL) Does Not Fit All: SIL Misuse and Unsafe Operational Conditions

The Value of a 3rd Party in HIL Testing

April 27, 2015

Hardware in the Loop (HIL) testing continues to gain recognition as an effective verification method to improve the …

Read moreThe Value of a 3rd Party in HIL Testing

Clarifying Regulations for Independent 3rd Party Inspection of BOP and Diverter in the U.S. Gulf of Mexico

March 3, 2015

In response to the 2010 Macondo incident, the US Federal regulations governing drilling for oil and gas on the US outer …

Read moreClarifying Regulations for Independent 3rd Party Inspection of BOP and Diverter in the U.S. Gulf of Mexico

Athens Group White Paper: Applying Systems Engineering to BOP Verification

March 3, 2015

Any qualified independent third party can deliver an inspection checklist demonstrating BOP equipment compliance to …

Read moreAthens Group White Paper: Applying Systems Engineering to BOP Verification

Athens Group White Paper: 20kPSI BOP: Preparing Your Operational Framework

March 3, 2015

Athens Group Services surveyors explore the potential impact of 20kPSI BOPs on your operational framework so you can …

Read moreAthens Group White Paper: 20kPSI BOP: Preparing Your Operational Framework
  • Previous
  • Page 1
  • Interim pages omitted …
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Next
  • Home
  • Services
    • Reactivation, Commissioning, and Upgrade
    • Marine Services
    • Rig Inspection & Acceptance
    • Well Control Equipment
    • Cybersecurity
      • TMECA®
    • Risk Management
  • About Us
    • About Us
    • Our Mission & Core Business Principles
    • Athens Group Services Advantage
    • Surveyor Competency Assurance
    • Integrated Knowledge Management
    • Covid-19 Policy
    • Workplace
    • CyberSecurity Policy
  • News & Resources
    • Projects
    • Newsletters
    • Oil Field Digitalization
  • Contact

Contact


(858) 926-5504

Contact Us

Follow Us


Follow along on social media

  • Twitter
  • LinkedIn

Copyright © 2025 · Athens Group Services · All Rights Reserved

Return to top